2 weeks ago - edited
# jtDdJL6YHka6qZXH```
// START LOG
--------------------------------------------------------------------------------
SUBJECT: "Experimental Weapons Program"
OPERATOR: "Papa"
ATTENDING: "Cat, Pootis"
DATE: "12/10/2025"
--------------------------------------------------------------------------------
- I collected old parts from storage and dismantled them and an old TL-50. Once this was completed I inspected them ensuring they where clean and fully functional then commenced disassembly. Some faults that where not visible initially where discovered so these where corrected and then moved onto next stage. I assembled a barrel using some of the machinery and tubing from a roomba. Then a trigger mechanism and power cell housing using b2 parts. After this checks for overheating was done and this problem was half solved by modifying air-conditioning units to cool or [Mini versions] once this was completed tests began. First few showed issues with overheating. Further modifications will be made.
--------------------------------------------------------------------------------
// END LOG
```
Current:
501st Vice Commander Vill [3rd Vill]
MC SRS CPT Papa
Former:
MC Rancor SRM 2LT Avro Arrow 5585
101st CPT Nord
Shock ARF CPT Thire 5585
Senate Commando CoCaptain Papa